This facility was observed to have degradation to the wood posts supporting two stories of decks. Years of snow and moisture intrusion had deteriorated the lower support of the decks. Echelon Construction is engaged in Remove & Replace for this problem. The decks will be rebuilt and the support posts will be entirely replaced. Looking to trusted vendors on the deck membrane issues, it will be replaced with EPDM and sloped to shed water. The deck surfaces will be paver material to allow water to shed, instead of stand against the building.